Client & Engagement
Multi-Location Building Materials Retailer
Industry Sector
Building Materials Retail
Jurisdiction & Geography
India
Practice Leadership
Management Consulting
Mandate Performance Metrics
Average InventoryRs 8.5 CroreInventory held across the retailer's three locations.
Initial Shrinkage Rate4.2%Annual inventory shrinkage identified through the physical count.
Industry Benchmark1.5%Reference shrinkage level for managed building-materials retail used in the assessment.
Preventable Excess ShrinkageRs 23 LakhAnnual loss associated with shrinkage above the benchmark level.

Executive Mandate Summary

Northrop conducted a 16-day inventory controls audit for a building materials retailer with Rs 22 crore revenue and Rs 8.5 crore inventory across three stores. Annual shrinkage stood at 4.2%, creating approximately Rs 23 lakh of excess annual loss above the industry benchmark. The audit identified key gaps in receiving verification, high-value inventory storage and dispatch controls. Northrop implemented independent receiving checks, restricted storage and documented pick-and-pack procedures. Within six months, aggregate shrinkage reduced from 4.2% to 2.2%, delivering an estimated Rs 17 lakh annual improvement without additional capital investment.

Key Transaction & Governance Challenges

  • •
    The retailer's 4.2% shrinkage rate was substantially above the approximately 1.5% benchmark, creating a material inventory-loss exposure.
  • •
    Store A operated at 2.8% shrinkage, while Stores B and C recorded 5.1% and 6.8%, respectively. The problem was therefore concentrated rather than system-wide.
  • •
    Electrical fittings, plumbing accessories and tiles accounted for disproportionate shrinkage due to their size, value, handling requirements and receiving complexity.
  • •
    The employee receiving goods was also responsible for the ordering process, with no second-person verification of quantities received.

Northrop Execution Architecture & Methodology

1
Northrop analysed physical inventory differences across all three stores and identified the locations and product categories contributing disproportionately to shrinkage.
2
Receiving, storage, dispatch and customer collection processes were observed directly at Stores B and C to identify the operational causes behind the inventory variances.
3
Each identified shrinkage driver was mapped to a targeted control covering independent receiving verification, restricted storage and documented dispatch.
4
The controls were introduced and shrinkage performance was subsequently measured across the stores to determine whether the operational changes reduced inventory leakage.

Executive Mandate Overview

A building materials retailer with Rs 22 crore annual revenue held approximately Rs 8.5 crore of inventory across three stores. Its annual physical count showed 4.2% shrinkage, representing approximately Rs 35.7 lakh of lost inventory.

Compared with the approximately 1.5% industry benchmark, the excess shrinkage represented approximately Rs 23 lakh of potentially preventable annual loss.

Identifying Where Shrinkage Occurred

Shrinkage analysis showed a clear concentration. Store A recorded 2.8%, Store B 5.1% and Store C 6.8%.

At category level, electrical fittings recorded 8.2% shrinkage, plumbing accessories 6.5% and tiles 4.8%. This allowed the engagement to focus fieldwork on the highest-risk locations and products.

Diagnosing Receiving Controls

At Stores B and C, the person receiving goods was also responsible for the ordering process. Deliveries were not independently counted, creating an opportunity for short deliveries to enter the system as complete receipts.

Northrop introduced independent quantity verification, with discrepancies identified immediately and escalated to suppliers.

Securing High-Risk Inventory

High-value electrical and plumbing products were stored in open-access areas. At Store C, customers could also enter the warehouse area.

These categories were moved into restricted storage, with designated access and a daily sign-out register for removed items.

Verifiable Institutional Outcomes & Value Realized

  • The improvement was achieved through process discipline, segregation of responsibilities, restricted access and documentation rather than new capital expenditure.
  • The resulting improvement represented approximately Rs 17 lakh of annual reduction in preventable inventory loss.
  • Annual excess inventory loss above the benchmark was reduced substantially following implementation.
  • Overall inventory shrinkage declined by 2 percentage points across the three-store network.
Ashish Chaudhary

Ashish Chaudhary

Managing Director•Management Consulting
Private Mandate Advisory Desk

Facing a Similar High-Stakes Transaction or Turnaround?

Northrop partners execute buy-side due diligence, fraud forensics, and financial restructuring with strict board confidentiality and unmatched technical rigor across Indian jurisdictions.

Next Documented MandateManagement Consulting

Case Study: Ghost Trainees and Unverified Placements in a Skill Development NGO

A skill development NGO reported that 1,200 youth had been trained and 840 placed in jobs under a programme funded through a ₹1.4 crore CSR contribution. The reported 70% placement rate prompted an independent review of beneficiary records, training delivery, placement claims and programme expenditure. Northrop Management Private Limited conducted a forensic verification covering beneficiary deduplication, attendance records, direct beneficiary calls, employer confirmations, offer letters, salary claims and the underlying financial trail.

View Full Mandate Record